MORE
designs, manufactures, installs and commissions advanced
"process technology packages" related to chemical
energy, auxiliary equipment and water cooled elements
for the Electric Arc Furnace steel-making mini mills.
Continuous research & development, top-class manufacturing
quality, high skilled specialists, reliable equipment
and process know-how are the basis for our indisputable
leadership in the steel-making industry which accounts
for more than 600 successful installations all over
the world.
INSTALLATION OF LINDARC(TM )REAL TIME LASER OFF-GAS ANALYSIS SYSTEM AT GERDAUAMERISTEEL JACKSONVILLE (U.S.A.) ELECTRIC ARC FURNACE.
In September 2010, MORE srl (Gemona del Friuli, Italy) successfully installed the innovative LINDARC(TM) real time laser EAF off-gas analysis system at GerdauAmeristeel Jacksonville (Florida, U.S.A.).
KROMAN ÇELIK SANAYII A.S. (TURKEY) SUCCESSFULLY COMMISSIONED THE MODULE TECHNOLOGY.
On July 2010, Kroman Çelik Sanayii A.S, located in Gebze (Turkey) has successfully commissioned the MODULE TECHNOLOGY fix injection system supplied by MORE srl (Gemona del Friuli-Italy) in the new 150ton electric arc furnace.